Industries · Construction

Keep the site and the office on the same record.

A site engineer photographs a cracked shuttering panel, posts it to a group and gets back to the pour. By evening the photo is buried under the day’s messages and nobody in the office has ordered a replacement. Construction software has to catch that moment and put it in front of someone who can act.

Most construction firms are not short of information. The daily progress report, the indent for steel, the delivery challan, the subcontractor’s running bill and the photos of last week’s slab all exist somewhere. They live on different phones, in different sheets and in the heads of different people, and the connection between them gets lost on the way from site to office.

When we build for a construction business, that connection is where we start. An indent should know which project and which BOQ item it belongs to. A delivery should be checked against the indent it fulfils. A contractor’s bill should be measured against work someone actually recorded. Once those links hold, most of the reports management asks for come straight out of records people were already making.

Who uses the tool shapes it as much as what it records. A supervisor with dusty hands, patchy signal and a concrete truck due in twenty minutes needs a couple of taps and an offline save. A project manager reviewing indents at night needs the context on one screen. A director comparing sites needs every project to record the same things the same way.

One material request, start to finish.

Usually the first workflow we’d build, because so many other reports lean on it.

01 · RAISE

The site asks

A supervisor raises an indent on their phone with the project, item, quantity, required-by date and a photo if it helps. It saves without signal and syncs once the phone reconnects.

02 · APPROVE

The office checks

The project manager sees the request against budgeted quantities and what is already on order, then approves, edits or rejects it. Higher-value requests can go to a second approver.

03 · ORDER

Purchase places it

Purchasing raises the supplier order and records the expected delivery. The site can see the request moving without ringing anyone.

04 · RECEIVE

The store confirms

The storekeeper records what arrived against the order with a photo of the challan. A short or damaged delivery stays open on the original request.

Same week, two ways.

On calls and sheets

Everyone is chasing.

Requests come in by phone and chat, the purchase sheet is updated in a batch at the end of the day, and nobody can quickly say which deliveries are still short.

  • Indents without a project code
  • Challans filed by date rather than by order
  • Bills checked from memory
On a shared record

Everyone can look it up.

Each request carries its project, approval and delivery status. Billing can see what was received and measured before releasing a payment, and every decision is kept in an audit trail.

  • Open shortages listed by site
  • Approvals with names and times
  • Contractor work tied to recorded progress

Answer these on site, not in a meeting room.

  • How good is the signal where people will really use the app, and does it have to work offline?
  • Who fills in the daily progress report: the site engineer, a supervisor or the contractor’s own staff?
  • Which approvals depend on value, item type or project, and who covers when an approver is on leave?
  • Do site and purchase use the same names for materials, or does each keep its own list?
  • What evidence does billing need before a running bill is passed: measurements, photos, a signed sheet?
  • Which records must be kept for the client, the architect or an audit, and for how long?

Contractors and project heads ask.

Can one system cover several sites?

Yes. Each project keeps its own indents, stock and progress, while management sees all of them side by side in the same format.

Can subcontractors log their own progress?

They can, through a limited login that shows only their work orders on their sites. Your engineer then verifies what they submit before it counts towards a bill.

We keep accounts in Tally or an ERP. Does that change?

It doesn’t have to. Purchase orders and approved bills can flow to your accounting system where it allows an import or a connection, and accounts carries on as it does now.

Contact

Start with one site and one request type.

Tell us how indents move today and where they stall, and we’ll suggest the smallest useful first release.

Message on WhatsApp